Perfection Group have been striving hard to increase the turnaround speed of our Unit based full refurbishment wheels. We are very pleased to announce that we have introduced two brand new large turbo fanned gas ovens into our unit. These ovens have increased the wheel holding capacity by up to an additional 400% and have helped to dramatically reduce the overall wheel refurbishment turnaround time.
We have also introduced a new faster bigger wheel paint removal bath that can hold 4 times more wheels then the previous bath, again decreasing the turnaround period.